Water Code section 75541


Within six months after the date of establishing a zone or zones, all water-producing facilities located within the boundaries of such zone or zones shall be registered with the district and, if required by the board, shall be measured with a water-measuring device satisfactory to the district, which shall be installed by the district or, at the district’s option, by the operator thereof.

Source: Section 75541, https://leginfo.­legislature.­ca.­gov/faces/codes_displaySection.­xhtml?lawCode=WAT§ionNum=75541.­ (updated Jan. 1, 1965; accessed Jun. 25, 2025).

Green check means up to date. Up to date

Verified:
Jun. 25, 2025

§ 75541's source at ca​.gov