Public Utilities Code section 30636
(a)
The estimated cost of the proposed acquisition, and construction and all incidental expenses connected therewith.(b)
The probable sources of income from the system and the estimated amount thereof.(c)
The estimated cost of maintenance and operation thereof.(d)
The proposed method or methods of financing.(e)
Any other information deemed pertinent, including, without limitation, a preliminary sketch or sketches, plan or plans or design of stations, platforms, terminals, structures and facilities constituting a method of rapid transit (all of the foregoing being hereafter referred to in this section by the word “facilities”), the proposed locations thereof and the proposed routes of the system.
Source:
Section 30636, https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=PUC§ionNum=30636.
(updated Jan. 1, 1967; accessed Jun. 25, 2025).