Public Utilities Code section 2837
(a)
Integrate intermittent generation from eligible renewable energy resources into the reliable operation of the transmission and distribution grid.(b)
Allow intermittent generation from eligible renewable energy resources to operate at or near full capacity.(c)
Reduce the need for new fossil-fuel powered peaking generation facilities by using stored electricity to meet peak demand.(d)
Reduce purchases of electricity generation sources with higher emissions of greenhouse gases.(e)
Eliminate or reduce transmission and distribution losses, including increased losses during periods of congestion on the grid.(f)
Reduce the demand for electricity during peak periods and achieve permanent load-shifting by using thermal storage to meet air-conditioning needs.(g)
Avoid or delay investments in transmission and distribution system upgrades.(h)
Use energy storage systems to provide the ancillary services otherwise provided by fossil-fueled generating facilities.
Source:
Section 2837, https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=PUC§ionNum=2837.
(accessed Jun. 2, 2025).