Labor Code section 7261


When gathering and stacking temporary floor plank on a lower floor, in preparation for transferring such plank for use on an upper working floor, the steel erector’s personnel shall remove such plank successively, working toward the last panel of such floor, so that the work is always being done from the planked floor.

Source: Section 7261, https://leginfo.­legislature.­ca.­gov/faces/codes_displaySection.­xhtml?lawCode=LAB§ionNum=7261.­ (updated Jan. 1, 1970; accessed Jun. 23, 2025).