(a)
The commission shall investigate the ability of electrical corporations and gas corporations to provide various energy efficiency financing options to their customers for the purposes of implementing the program developed pursuant to Section 25943 of the Public Resources Code.
(b)
Recognizing the already underway 2015 commission work to
adopt efficiency potential and goals, the Energy Commission work on its 2015 energy demand forecast, and the need to determine how to incorporate meter-based performance into determinations of goals, portfolio cost-effectiveness, and authorized budgets, the commission, in a separate or existing proceeding, shall, by September 1, 2016, authorize electrical corporations or gas corporations to provide financial incentives, rebates, technical assistance, and support to their customers to increase the energy efficiency of existing buildings based on all estimated energy savings and energy usage reductions, taking into consideration the overall reduction in normalized metered energy consumption as a measure of energy savings. Those programs shall include energy usage reductions resulting from the adoption of a measure or installation of equipment required for modifications to existing buildings to bring them into conformity with, or exceed, the requirements of Title 24 of the California Code of Regulations, as
well as operational, behavioral, and retrocommissioning activities reasonably expected to produce multiyear savings. Electrical corporations and gas corporations shall be permitted to recover in rates the reasonable costs of these programs. The commission shall authorize an electrical corporation and gas corporation to count all energy savings achieved through the authorized programs created by this subdivision, unless determined otherwise, toward overall energy efficiency goals or targets established by the commission. The commission may adjust the energy efficiency goals or targets of an electrical corporation and gas corporation to reflect this change in savings estimation consistent with this subdivision and subdivision (d).
(c)
Effective January 1, 2016, electrical corporations and gas corporations are authorized to implement the provisions of subdivision (b) for high opportunity projects or programs. The commission shall provide expedited
authorization of high opportunity projects and programs to apply the savings baseline provisions in subdivision (b).
(d)
In furtherance of subdivision (b), the commission, in consultation with the Energy Commission, shall consider all of the following:
(1)
The results of any interagency baseline assessment.
(2)
Any available results from investor-owned utility baseline pilot studies ordered in D.14-10-046.
(3)
Information necessary to ensure consistency with the energy forecast and planning functions of the Energy Commission and the Independent System Operator.
(e)
The commission may direct electrical corporations and gas corporations to make filings that are necessary to ensure
coordination with the energy forecast and planning functions of the Energy Commission and the Independent System Operator.
(f)
The commission shall prioritize energy efficiency activities consistent with Sections 454.55 and 454.56.