On a notice which proposes an expanded ultimate electric generating capacity for a site, the commission may, based upon findings pursuant to Section 25514, either approve the notice only for the initial facility or facilities proposed for operation within the forthcoming 12-year period or may approve the notice for the initial facility or facilities and find the site acceptable for additional generating capacity of the type tentatively proposed. The maximum allowable amount and type of such additional capacity shall be determined by the commission.
If a notice is approved which includes a finding that a particular site is suitable to accommodate a particular additional generating capacity, the site shall be designated a potential multiple-facility site. The commission may, in determining the acceptability of a potential multiple-facility site, specify conditions or criteria necessary to insure that future additional facilities will not exceed the limitations of the site.
25500
25500.1
25500.5
25501
25501.7
25502
25502.3
25503
25504
25504.5
25505
25506
25506.5
25507
25508
25509
25509.5
25510
25511
25512
25512.5
25513
25513.3
25514
25514.3
25514.5
25515
25516
25516.1
25516.5
25516.6
25517
25518
25518.5
25519
25519.5
25520
25520.5
25521
25522
25523
25524
25524.1
25524.2
25524.5
25525
25526
25527
25528
25529
25530
25531
25532
25534
25534.1
25534.2
25535
25537
25538
25539
25540
25540.1
25540.2
25540.3
25540.4
25540.5
25540.6
25541
25541.1
25541.5
25542
25543
25500.1
25500.5
25501
25501.7
25502
25502.3
25503
25504
25504.5
25505
25506
25506.5
25507
25508
25509
25509.5
25510
25511
25512
25512.5
25513
25513.3
25514
25514.3
25514.5
25515
25516
25516.1
25516.5
25516.6
25517
25518
25518.5
25519
25519.5
25520
25520.5
25521
25522
25523
25524
25524.1
25524.2
25524.5
25525
25526
25527
25528
25529
25530
25531
25532
25534
25534.1
25534.2
25535
25537
25538
25539
25540
25540.1
25540.2
25540.3
25540.4
25540.5
25540.6
25541
25541.1
25541.5
25542
25543