In approving applications pursuant to this chapter, the board shall encourage the design and construction of facilities which will conserve unreplenishable energy resources by consideration of alternate design and insulation concepts as well as unconventional energy sources. In so doing, the board may increase cost allowances to reflect the difference between conventional and unconventional concepts when the board is satisfied that the life cycle cost of the project is not expected to exceed the life cycle cost of a conventionally designed project.
17010
17011
17012
17013
17014
17015
17016
17017
17017.1
17017.2
17017.5
17017.6
17017.7
17017.9
17018
17018.5
17018.7
17019
17019.3
17019.5
17020
17021
17021.3
17021.4
17022
17022.7
17023
17024
17024.5
17025
17029
17029.5
17030
17030.2
17030.3
17030.5
17030.6
17031
17032
17032.3
17032.5
17033
17034
17035
17036
17038
17039
17039.1
17039.2
17011
17012
17013
17014
17015
17016
17017
17017.1
17017.2
17017.5
17017.6
17017.7
17017.9
17018
17018.5
17018.7
17019
17019.3
17019.5
17020
17021
17021.3
17021.4
17022
17022.7
17023
17024
17024.5
17025
17029
17029.5
17030
17030.2
17030.3
17030.5
17030.6
17031
17032
17032.3
17032.5
17033
17034
17035
17036
17038
17039
17039.1
17039.2